- Week Ending 3/8/24:
J.A. Polito & Sons stopped trench work for the winter on Friday, December 15, 2023.
There will be no construction through week ending 3/8/24.
- Week Ending 3/15/24:
J.A. Polito & Sons stopped trench work for the winter on Friday, December 15, 2023.
There will be no active construction through week ending 3/15/24, however, J.A. Polito & Sons Inc. may begin re-mobilizing equipment and materials to their Main Street yard location (outside of right-of-way) during the week.
- Week Ending 3/22/24
: J.A. Polito & Sons Inc. Crew #1 is expected to resume construction on Main Street
(between River Street Rotary and Caldwell Street)beginning on Monday, March 18, 2024. There are no detours expected to complete this work, however, it may impact vehicular travel through Main Street. Traffic management will be provided at the direction of Fitchburg Police Department.
- Week Ending 3/29/24
: There will be no active construction through week ending 3/29/24, however, J.A. Polito & Sons Inc. has begun re-mobilizing equipment and materials to their Main Street yard location (outside of right-of-way).
- Week Ending 4/5/24
: J.A. Polito & Sons Inc. Crew #1 is expected to resume construction on Main Street beginning on Monday, April 1, 2024. During construction hours (7:00 MA to 5:00 PM), traffic on Main Street between Caldwell Street and the River Street Rotary will be rerouted. However, Main Street will remain accessible to local residences and businesses. The work, including green infrastructure and new sewer installation, is expected to last approximately 4 weeks. Main Street traffic will be rerouted using various local streets as shown in the attached Main Street West Detour Map. Traffic management will be provided at the direction of Fitchburg Police Department.
- Week Ending 4/12/24
: During construction hours (7:00 MA to 5:00 PM), traffic on Main Street between Caldwell Street and the River Street Rotary will be rerouted. However, Main Street will remain accessible to local residences and businesses. Main Street traffic will be rerouted using various local streets as shown in the attached
Main Street West Detour Map. Traffic management will be provided at the direction of Fitchburg Police Department.
- Week Ending 4/19/24
: During construction hours (7:00 MA to 5:00 PM), traffic on Main Street between Caldwell Street and the River Street Rotary will be rerouted. Please see previous week for further details on traffic detour, additional work locations provided below. 1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas:
Main Street (Between River Street Rotary and Caldwell Street) – (New Sewer Installation)
2. J.A. Polito & Sons Inc. - Crew 2 – Excavation work in the following areas:
Lagoon Pit - (Off-site Organization & Cleanup – outside of right of way)
Main Street (Between River Street Rotary and Caldwell Street) – (Green Infrastructure Installation)
- April 22, 2024:
School Street: Beginning Monday, April 22nd, during construction hours (7:00 MA to 5:00 PM), traffic on School Street will be rerouted. Construction will begin near the intersection of Main Street and will proceed North. During this time, no parking signs near the construction zone will be in place at the direction of Fitchburg Police Department. The work, including new sewer and drainage installation, is expected to last approximately 4 to 6 weeks. School Street traffic will be rerouted using various local streets at the direction of Fitchburg Police Department. Local traffic to follow all signage. Chestnut Street: Beginning Monday, April 22nd, during construction hours (7:00 MA to 5:00 PM), traffic on Chestnut Street between Main Street and Goddard Street will be rerouted. During this time, no parking signs near the construction zone will be in place at the direction of Fitchburg Police Department. The work, including green infrastructure installation, is expected to last approximately 4 weeks. Chestnut Street traffic will be rerouted using various local streets at the direction of Fitchburg Police Department. Local traffic to follow all signage.
- Week Ending 4/26/24
: Please note, there will be no parking allowed on School Street at this time. During construction hours (7:00 MA to 5:00 PM), traffic on Main Street between Caldwell Street and the River Street Rotary will be rerouted. Please see previous week for further details on traffic detour, additional work locations provided below. 1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: Main Street (Between River Street Rotary and Caldwell Street) – (New Sewer Installation) School Street (Between Main Street and Arlington Street) NO PARKING – (Green Infrastructure Installation) 2. J.A. Polito & Sons Inc. - Crew 2 – Excavation work in the following areas: Main Street (Between River Street Rotary and Caldwell Street) – (Green Infrastructure Installation) Chestnut Street (Between Main Street and Goddard Street)– (Green Infrastructure Installation)
- Week Ending 5/3/24
: Beginning Monday, April 22nd, during construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Chestnut Street (between Main Street and Goddard Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (Green Infrastructure Installation) 2. J.A. Polito & Sons Inc. - Crew 2 – Excavation work in the following areas: Chestnut Street (Between Main Street and Goddard Street)– (Green Infrastructure Installation)
- Week Ending 5/10/24:
Beginning Monday, April 22nd, during construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Chestnut Street (between Main Street and Goddard Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1.J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation) 2. J.A. Polito & Sons Inc. - Crew 2 – Excavation work in the following areas:
Chestnut Street (Between Main Street and Goddard Street)– (Green Infrastructure Installation)
- Ashburnham Hill Road:
Beginning Wednesday, May 8th, during construction hours (7:00 AM to 5:00 PM), traffic on Ashburnham Hill Road will be r
erouted During this time,
residentsare asked to access the upper portion of Ashburnham Hill Road using various local streets at the direction of the Fitchburg Police Department officers on site. The work, including new manhole installation, is expected to last three days. Local traffic to follow all signage.
- Week Ending 5/17/24
: Beginning Monday, May 13th, during construction hours (7:00 AM to 5:00 PM), traffic on Caldwell Street (between Main Street and Arlington Street) will be rerouted. Local traffic and abutters will be directed by Fitchburg Police Department on site. Please note that parking on Caldwell Street will not be allowed near the construction zone. No parking signs will be placed in the necessary areas by FPD.
Beginning Monday, April 22nd, during construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) will be rerouted. Please note, parking and traffic will be affected.
- Week Ending 5/24/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation)
Arlington Street (Between Chestnut Street and Prospect Street) – (New Sewer and Drain Installation)
- Week Ending 5/31/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation)
Arlington Street (Between Chestnut Street and Prospect Street) – (New Sewer and Drain Installation)
- Week Ending 6/7/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Arlington Street (Between Chestnut Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 6/14/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Arlington Street (Between Chestnut Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 6/21/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Arlington Street (Between Chestnut Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 6/28/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 7/5/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 7/10/24:
During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 & 2 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work) Arlington Street (Between Bond Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 7/12/24
: Beginning Monday, July 8th, during construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and Haskell Street) will be rerouted. Local traffic and abutters will be directed by Fitchburg Police Department on site. Please note that parking on Bond Street will not be allowed near the construction zone. No parking signs will be placed in the necessary areas by FPD. Please see the
attached mapfor detailed work location and attached notices which were distributed to residents and businesses in the immediate vicinity. During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street) and Arlington Street (between Chestnut Street and Prospect Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 & 2 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Arlington Street (Between Bond Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Bond Street (Between Goddard Street and Haskell Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 7/19/24
: During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street), Arlington Street (between Chestnut Street and Prospect Street), and Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 & 2 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Arlington Street (Between Bond Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Bond Street (Between Goddard Street and Haskell Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 7/26/24
During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street), Arlington Street (between Chestnut Street and Prospect Street), and Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.1. J.A. Polito & Sons Inc. - Crew 1 & 2 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work)
Arlington Street (Between Bond Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Bond Street (Between Goddard Street and Haskell Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 8/2/24:
During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street), Arlington Street (between Chestnut Street and Prospect Street), and Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 & 2 – Excavation in the following areas:
School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work) Arlington Street (Between Bond Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Bond Street (Between Goddard Street and Haskell Street) – (New Sewer and Drain Installation, Misc. Water Work)
Prince Street – (New Sewer and Drain Installation)
- Week Ending 8/9/24:
During construction hours (7:00 AM to 5:00 PM), traffic on School Street (between Main Street and Arlington Street), Arlington Street (between Chestnut Street and Prospect Street), and Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note,
parkingand traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 & 2 – Excavation in the following areas: School Street (Between Main Street and Arlington Street) – (New Sewer and Drain Installation, Misc. Water Work) Arlington Street (Between Bond Street and Prospect Street) – (New Sewer and Drain Installation, Misc. Water Work)
Bond Street (Between Goddard Street and Haskell Street) – (New Sewer and Drain Installation, Misc. Water Work)
- Week Ending 8/16/24:
Beginning Monday, August 5th, parking in areas to be milled and prepped for pavement will be limited. Residents are asked to please obey all no parking signage at the direction of Fitchburg Police.
During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 – Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work)
2. Amorello and J.A. Polito & Sons Inc. - Adjusting structures in preparation for paving in the following areas:
Caldwell Place
Park Street Chestnut Street (Between Main Street and Goddard Street) Bond Street (Between Goddard Street and Arlington Street) Goddard Street
- Week Ending 8/23/24:
Beginning Wednesday, August 14th, parking in areas to be milled and prepped for pavement will be limited. Residents are asked to please obey all no parking signage at the direction of Fitchburg Police.
During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work) 2. Amorello and J.A. Polito & Sons Inc. Crew 2 - Adjusting structures in preparation for paving in the following areas:
Caldwell Place
Park Street
Chestnut Street (Between Main Street and Goddard Street) Bond Street (Between Goddard Street and Arlington Street) Goddard Street
- Week Ending 8/30/24:
Beginning Monday, August 19th, parking in areas to be milled and prepped for pavement will be limited. Residents are asked to please obey all no parking signage at the direction of Fitchburg Police. During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work) 2. Amorello and J.A. Polito & Sons Inc. Crew 2 - Adjusting structures in preparation for paving in the following areas: Caldwell Place Park Street
Chestnut Street (Between Main Street and Goddard Street)
Bond Street (Between Goddard Street and Arlington Street)
Goddard Street
- Week Ending 9/6/24:
Beginning Monday, August 19th, parking in areas to be milled and prepped for pavement will be limited. Residents are asked to please obey all no parking signage at the direction of Fitchburg Police. During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected –(map). 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work) 2. J.A. Polito & Sons Inc. Crew 2 - Adjusting structures in preparation for paving in the following areas:
Caldwell Place
Park Street
Chestnut Street (Between Main Street and Goddard Street) Bond Street (Between Goddard Street and Arlington Street) Goddard Street
- Week Ending 9/13/24:
Beginning Monday, August 19th, parking in areas to be milled and prepped for pavement will be limited. Residents are asked to please obey all no parking signage at the direction of Fitchburg Police. During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and Haskell Street) will be rerouted. Please note, parking and traffic will be affected – (map). 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work) Crescent Heights – (New Sewer Installation)
2. Amorello and J.A. Polito & Sons Inc. Crew 2 - Adjusting structures in preparation for paving and completing paving in the following areas:
Caldwell Place
Park Street Chestnut Street (Between Main Street and Goddard Street) Bond Street (Between Goddard Street and Arlington Street) Goddard Street
- Week Ending 9/20/24:
Beginning Monday, August 19th, parking in areas to be milled and prepped for pavement will be limited. Residents are asked to please obey all no parking signage at the direction of Fitchburg Police. During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Goddard Street and View Street) will be rerouted. Please note, parking and traffic will be affected –map. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work) Crescent Heights – (New Sewer Installation)
2. Amorello and J.A. Polito & Sons Inc. Crew 2 - Adjusting structures in preparation for paving and completing paving in the following areas:
Caldwell Place
Park Street Chestnut Street (Between Main Street and Goddard Street) Bond Street (Between Goddard Street and Arlington Street) Goddard Street
- Week Ending 9/27/24:
During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Arlington Street and View Street) will be rerouted. Please note, parking and traffic will be affected –map. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work)
- Week Ending 10/4/24:
During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Arlington Street and View Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Sewer and Drain Installation, Misc. Water Work)
- Week Ending 10/11/24:
During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Arlington Street and View Street) and View Street will be rerouted. Please note, parking and traffic will be affected –map. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Drain Installation)View Street – (New Drain Installation)
- Week Ending 10/18/24:
During construction hours (7:00 AM to 5:00 PM), traffic on Bond Street (between Arlington Street and View Street) and View Street will be rerouted. Please note, parking and traffic will be affected –map. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Bond Street (Between Arlington Street and View Street) – (New Drain Installation) View Street – (New Drain Installation)
- Week Ending 10/18/24:
During construction hours (7:00 AM to 5:00 PM), traffic on View Street (west of Bond Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details.
Beginning as soon as Monday, October 21st, during construction hours (7:00 AM to 5:00 PM), traffic on Crescent Heights will not be permitted. Due to the location and depth of pipe being installed, residents will not be able to enter/exit their homes during construction hours.Residents of Crescent Heights will be asked to relocate their vehicles the night before construction or before 7 AM. Parking will be available on Bond Street and Arlington Street for residents. The Fitchburg Police department will have officers on site, and residents may reach out to the police department for assistance with walking on Crescent Heights, accessing their homes, and any other safety concerns. During non-construction hours, vehicular access to Crescent Heights will be permitted for local traffic. Please see the attached Crescent Heights Notice which will be distributed to residents of Crescent Heights. Weston & Sampson plans to update residents with an exact start date as construction approaches. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: View Street (west of Bond Street) – (New Drain Installation) Crescent Heights – (New Sewer Installation)
- Week Ending 11/1/24:
During construction hours (7:00 AM to 5:00 PM), traffic on View Street (west of Bond Street) will be rerouted. Please note, parking and traffic will be affected –map. During construction hours (7:00 AM to 5:00 PM), traffic on Crescent Heights will not be permitted. Due to the location and depth of pipe being installed, residents will not be able to enter/exit their homes during construction hours. Residents of Crescent Heights will be asked to relocate their vehicles the night before construction or before 7 AM. Please see above for more details. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: View Street (west of Bond Street) – (New Drain Installation)
Crescent Heights – (New Sewer Installation)
- Week Ending 11/8/24
:
During construction hours (7:00 AM to 5:00 PM), traffic on View Street (west of Bond Street) will be rerouted. Please note, parking and traffic will be affected – please see above for more details. During construction hours (7:00 AM to 5:00 PM), traffic on Crescent Heights will not be permitted. Due to the location and depth of pipe being installed, residents will not be able to enter/exit their homes during construction hours. Residents of Crescent Heights will be asked to relocate their vehicles the night before construction or before 7 AM. Same traffic detour map as last week. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: View Street (west of Bond Street) – (New Drain Installation)
Crescent Heights – (New Sewer Installation)
2. National Water Main Cleaning Co. - Crew 1 – Trenchless rehabilitation in the following areas:
Various Streets – CCTV Inspection
- Week Ending 11/15/24:
During construction hours (7:00 AM to 5:00 PM), traffic on Crescent Heights will not be permitted. Due to the location and depth of pipe being installed, residents will not be able to enter/exit their homes during construction hours. Residents of Crescent Heights will be asked to relocate their vehicles the night before construction or before 7 AM. Area Map.1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Crescent Heights – (New Sewer Installation)
- Week Ending 11/22/24:
During construction hours (7:00 AM to 5:00 PM), traffic on Crescent Heights will not be permitted. Due to the location and depth of pipe being installed, residents will not be able to enter/exit their homes during construction hours. Residents of Crescent Heights will be asked to relocate their vehicles the night before construction or before 7 AM. Please see map for details. 1. J.A. Polito & Sons Inc. - Crew 1 - Excavation in the following areas: Crescent Heights – (New Sewer Installation)
- Week Ending 11/29/24:
There will be no active construction through week ending 11/29/24. J.A. Polito & Sons Inc. has begun re-mobilizing equipment and materials in advance of the Main Street Water Main project.
- Week Ending 12/6/2024:
There is currently no anticipated construction through December 6, 2024.
- There is currentlyno anticipated construction through December 13, 2024. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currentlyno anticipated construction through December 20, 2024. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currentlyno anticipated construction through December 27, 2024. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currentlyno anticipated construction through January 3, 2024. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks
- There is currently no anticipated construction through January 10, 2024.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through January 17, 2025
. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through January 24, 2025.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through January 31, 2025.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through February 7, 2025.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through February 14, 2025.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through February 21, 2025
. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through February 28, 2025.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through March 7, 2025
. We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts will commence in the coming weeks.
- There is currently no anticipated construction through March 14, 2025.
We will continue to provide schedule update emails weekly as trenchless rehabilitation efforts are anticipated to resume beginning the week of March 17, 2025.
- There is currently no anticipated construction through March 21,2025.
- Week Ending 3/28/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. National Water Main– Crew 1 – Trenchless Sewer CIPP Lining: Various Locations
a. Detailed schedule forthcoming as the start of lining work approaches in the CSO 010 area
- Week Ending 4/4/25
: Local traffic will be directed by the Fitchburg Police Department on site (
notice & map). Please note that parking near the construction zone will not be allowed.
1. National Water Main– Crew 1 – Trenchless Sewer CIPP Lining
a. Various Locations to include the following: i. Arlington Street ii. Caldwell Street iii. Goddard Street iv. Main Street v. Ashburnham Road vi. School Street vii. Chestnut Street viii. Bond Street ix. Haskell Street x. Park Street.
- Week Ending 4/11/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. National Water Main– Crew 1 – Trenchless Sewer CIPP Lining
a. Various Locations to include the following: i. Goddard Street ii. Main Street iii. Bond Street iv. Haskell Street v. Park Street
- Week Ending 4/18/25:
No Work Anticipated
- Week Ending 4/25/25:
No Work Anticipated
- Week Ending 5/2/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. Manhole Rehab Crew – Trenchless Manhole Rehabilitation: Various Locations a. Work Planned to begin Thursday, 5/1
- Week Ending 5/9/25
: Local traffic will be directed by the Fitchburg Police Department on site (
map). Please note that parking near the construction zone will not be allowed.
1. Manhole Rehab Crew – Trenchless Manhole Rehabilitation: Various Locations 2. Pipe Grout Crew – Trenchless Pipe Pressure Testing & Grouting: Various Locations a. Work Planned to begin Thursday, 5/8
- Week Ending 5/16/25:
Local traffic will be directed by the Fitchburg Police Department on site
(map). Please note that parking near the construction zone will not be allowed.
1. Pipe Grout Crew – Trenchless Pipe Pressure Testing & Grouting: Various Locations 2. Manhole Rehab Crew – Trenchless Manhole Rehabilitation: Various Locations
- Week Ending 5/23/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. Pipe Grout Crew – Trenchless Pipe Pressure Testing & Grouting: Various Locations 2. Manhole Rehab Crew – Trenchless Manhole Rehabilitation: Various Locations.
- Week Ending 5/30/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. Note: No work will occur Monday, May 26 due to the Memorial Day Holiday.
1. Pipe Grout Crew – Trenchless Pipe Pressure Testing & Grouting: Various Locations
- Week Ending 6/6/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. Note: No work will occur Monday, May 26 due to the Memorial Day Holiday.
1. Pipe Grout Crew – Trenchless Pipe Pressure Testing & Grouting: Various Locations 2. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 6/13/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 6/20/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 6/27/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 7/4/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. Also Note: No work will occur Friday, July 4 due to the Fourth of July Holiday.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations.
- Week Ending 7/11/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 7/18/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations.
- Week Ending 7/25/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 8/1/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations
- Week Ending 8/8/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations 2. Polito Crew – Paving Preparation: Various Locations to include: Arlington Street, Caldwell Street, School Street, Prince Street, Bond Street and Crescent Heights.
- Week Ending 8/15/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. CCTV Crew – Trenchless Post-Rehabilitation CCTV: Various Locations 2. Polito Crew – Paving Preparation: Various Locations to include: Arlington Street, Caldwell Street, School Street, Prince Street, Bond Street and Crescent Heights.
- Week Ending 8/22/25
: No construction work anticipated
- Week Ending 8/29/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. Polito Crew – Paving Preparation: Various Locations to include: Arlington Street, Caldwell Street, School Street, Prince Street, Bond Street and Crescent Heights.
- Week Ending 9/5/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. No work to occur on Monday, September 1 due to the Labor Day Holiday.
1. A.F. Amorello & Sons, Inc. and Polito Crews – Paving Preparation: Various Locations to include: Arlington Street, Caldwell Street, School Street, Prince Street, Bond Street and Crescent Heights.
- Week Ending 9/12/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. A.F. Amorello & Sons, Inc. and Polito Crews – Paving Preparation & Final Paving: Various Locations to include: Arlington Street, Caldwell Street, School Street, Prince Street, Bond Street and Crescent Heights.
- Week Ending 9/19/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. A.F. Amorello & Sons, Inc. and Polito Crews – Paving Preparation & Final Paving: Various Locations to include: Arlington Street, Caldwell Street, School Street, Prince Street, Bond Street and Crescent Heights
- Week Ending 9/26/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. A.F. Amorello & Sons, Inc. and Polito Crews – Paving Preparation & Final Paving: Various Locations to include: School Street Prince Street Bond Street Crescent Heights 2. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations.
- Week Ending 10/3/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. A.F. Amorello & Sons, Inc. and Polito Crews – Paving Preparation & Final Paving: Various Locations to include: School Street Prince Street Bond Street Crescent Heights 2. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations.
- Week Ending 10/10/25
: Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. A.F. Amorello & Sons, Inc. and Polito Crews – Paving Preparation & Final Paving: Various Locations to include: School Street Prince Street Bond Street Crescent Heights 2. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations.
- Week Ending 10/17/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations
- Week Ending 10/24/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. 1. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations
- Week Ending 10/31/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. 1. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations.
- Week Ending 11/07/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. National Water Main Crew – Misc. Trenchless Rehab and Rehab Warranty Inspections: Various Locations
- Week Ending 11/14/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. National Water Main Crew – Misc. Trenchless Rehab Warranty Inspections: Various Locations
- Week Ending 11/21/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. National Water Main Crew – Misc. Trenchless Rehab Warranty Inspections: Various Locations 2. Weston & Sampson Crew – Misc. survey investigation for as-builts: Various Locations
- Week Ending 11/28/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed. Also Note: There will be no work on Thursday 11/27 or Friday 11/28 due to the Thanksgiving Day Holiday.
1. National Water Main Crew – Misc. Trenchless Rehab Warranty Inspections: Various Locations 2. Weston & Sampson Crew – Misc. survey investigation for as-builts: Various Locations.
- Week Ending 12/05/25:
Local traffic will be directed by the Fitchburg Police Department on site. Please note that parking near the construction zone will not be allowed.
1. Weston & Sampson Crew – Misc. survey investigation for as-builts: Various Locations.
- Week Ending 12/19/2025:
There is currently no upcoming work scheduled for this project.
- Week Ending 12/26/2025:
There is currently no upcoming work scheduled for this project.
- Week Ending 01/02/2026:
There is currently no upcoming work scheduled for this project.
- Week Ending 01/09/2025:
There is currently no upcoming work scheduled for this project. At this time, a majority of the project work has been completed. Should we anticipate additional work, we will provide notification.
- Week Ending 01/23/2026:
There is currently no upcoming work scheduled for this project. At this time, a majority of the project work has been completed. Should we anticipate additional work, we will provide notification.
- Week Ending 01/30/2026:
There is currently no upcoming work scheduled for this project. At this time, a majority of the project work has been completed. Should we anticipate additional work, we will provide notification.
- Week Ending 02/06/2026: There is currently no upcoming work scheduled for this project. At this time, a majority of the project work has been completed. Should we anticipate additional work, we will provide notification.
- Week Ending 02/13/2026: There is currently no upcoming work scheduled for this project. At this time, a majority of the project work has been completed. Should we anticipate additional work, we will provide notification.